Skip to main content

Posts

Featured

Mainenance scheduled until December 11

I just spoke with one of the guys at the power plant in Gaylordsville. He said that the work is scheduled from now until December 11.  Work being done includes replacing outflow pipes on the plant and lots of stabilization to the canal.  All the canal work is dirt, sand, gravel, and stone.  No concrete will be poured (they are just digging in deep to see what needs to be replaced with new fill).

The work could stop if they are at a point where everything is stable and can operate with a good rain fall.  But, it does look like they plan to keep pushing through the next two months, so we might have some good water this Fall.  Keep your eyes on the gauge!!!

Latest Posts

1/2 on the paint (canal off for maint.)

$4 gear bag

river cleanup (and BBQ) this Sunday

1/2 (ish) today at 6 pm

1/2 on the paint at 5 pm today

a suprise 1/2' after work today

Higher than yesterday (but still not at 1')

Almost 1/2' on guage at 9 am

2 inches below top of block (5 pm)

Barely below 1 today at 7 pm